Construction Alert! Please plan accordingly when traveling to and from the airport! Construction is happening on Interstate 474 – Airport Exits. Construction Maps & Updates
Trip Cost Calculator
There are many reasons to choose an airport to fly from including ticket price, fuel and parking costs, as well as travel time to and from the airport.
Use our Trip Calculator to determine the true cost of your trip. Peoria International Airport is always the most convenient and affordable travel option!
Please update the number of days you need parking and the airfare costs to see your comparison.
Round trip mileage based on 0.00 miles to PIA, 171 miles to ORD, and 164 miles to MDW at $0.58/mile.
Tolls based on ticketed two axle vehicle round-trip.
Round trip travel times based on 0.00 hours to PIA, 2.5 hours to ORD, and 2.5 hours to MDW at $18/hour.
Long-Term Parking rates based on $17.00/day at ORD, $15.00/day at MDW.
SUMMER PARKING ALERT! As we experience large numbers of passengers throughout the Summer, our lots are filling or full. We continue to monitor our parking lots daily and will advise you where our largest capacity is – please check the construction sign at the entrance to see where we are directing you. If our lots are FULL, we will create supplemental parking and advise accordingly.
Safe Travels and Thank You for flying PIA!
Beginning April 14, 2025, construction traffic will begin on Phase 1 of the new Air Traffic Control Tower.
Construction will take place for 1 year, immediately followed by Phase 2, which will take an additional year.
For the duration of the project, the main terminal drive will be reduced to one lane between the Old Tower and the merge to Dirksen Parkway. In this section of roadway, outbound traffic will use the left lane, and construction traffic will use the right lane. This is to allow consturction traffic access to the work site (as shown in the map below).
Safe Travels and Thank You for flying PIA!